Just talk to our experts and get your dream project ready…
What We Do?
1. Soba West Irrigation Scheme including pump station (4-unit centrifugal pump 5.0 M3/sec & motor 1250 KW motor) and channelization.
2. 800 Drilling wells project – for the ministry of Irrigation and Electricity of Sudan including (800) wells and the installation of Grundfos submersible pumps, with generators, building water yards and
Electing elevated water tanks and pipeline.
3. Supplied (470) KM HDPE pipeline and (67) KM Ductile Cast Iron Pipeline for Public Drinking Water Corporation, Sudan.
4. Supplied (840) units of submersible pumps and (260) sets of generators for the Ministry of Irrigation in Sudan.
5. Supplying (960) sets of Elevated Water Tanks for the Ministry of Finance in Sudan.
6. Supplied and built Irrigation Pump Stations (KuKu Scheme, Gemoyer Agriculture and Al Lalapho), 24SH-20 Pumps for the Ministry of Agriculture and animal Resources Khartoum State in Sudan.
7. Supplied (1000) complete solar pump units with water tanks and pipes for Dam Implementation Unit(DIU), for the ministry of Water Resources, Irrigation and Electricity of Sudan.
8- supplying 2 Pumps Loaded on Floating Pontoon with total discharge 3m3/Sec for Al Nasriya Pump Station / with Ministry of Water Resources and Ministry of Industrial (Ibn Majid State Company) – Iraq.
9- supplying 2 Pumps Loaded on Floating Pontoon with total discharge 2m3/Sec for Al-Khuzamiya Pump station (Salah – Aldeen) / with Ministry of Water Resources and
Ministry of Industrial (Ibn Majid State Company) – Iraq.
10- supplying 2 Pumps Loaded on Floating Pontoon with total discharge 2m3/Sec for Duwaneesh Pump station (DW4) / with Ministry of Water Resources and Ministry of
Industrial (Ibn Majid State Company) – Iraq.
Our Recent Projects
Creating Solutions, building stronger communities.
Gallery
Here are some pictures from our projects in Al Khuzamiya & AL Nasriyah














We’re ready to work with you